ISO 9001 · 14001 · 45001IATF 16949QUALICOATUL 1332CNAS L15415
sales@wanancoat.com  ·  +86-13559663052
  1. Home
  2. How-to guides
  3. Run a powder coating line trial with WANAN samples

How-to guide

How to run a powder coating line trial with WANAN samples

Send your part data, receive candidate series with sample powder and colour panels, spray them on your own line while recording the object-temperature profile, then qualify the panels in the laboratory before production release.

Spray test of powder coating samples

When to use this guide

Use it when switching supplier, qualifying a new part or colour, or when a distributor brings a new end-user project.

What you need

  • Part data: substrate, pretreatment, service environment, current system, oven profile, specification
  • Sample powder and colour panels from WANAN
  • A temperature data logger and film thickness gauge

Steps

  1. Send the enquiry and part data

    Substrate, pretreatment, service environment, current system, oven profile and the specification the part must pass.

  2. Receive candidate series and samples

    WANAN proposes series with the TDS basis and sends colour-matched sample powder and panels. Samples ship as non-hazardous goods.

  3. Spray the trial on your line

    Coat trial panels or real parts on your production line and record the object-temperature profile.

  4. Qualify in the laboratory

    Test adhesion, impact, bend, humidity, salt spray or weathering in WANAN’s CNAS-accredited laboratory or in your own programme.

  5. Release with batch control

    Production runs under ISO 9001 and IATF 16949 with batch testing and a certificate of analysis, in 25 kg cartons.

Key values

ItemValueSource
Enquiry replyWithin one working day, Mon–Sat 09:00–18:00 (UTC+8)Contact
Sample shippingNon-hazardous goodsRequest a sample
LaboratoryCNAS L15415Manufacturing & quality
Packing25 kg cartons with certificate of analysisManufacturing & quality
Values apply to the stated test methods and conditions. Final settings are confirmed on your own parts and line.

Common mistakes

  • Trialling only flat panels instead of real parts
  • Not recording the oven profile during the trial
  • Approving colour under shop lighting only
  • Changing pretreatment between trial and production

Published 7 October 2026 by the WANAN technical team. Figures are taken from WANAN technical data sheets and the pages linked above.

Technical support

Talk to our technical team

Send the substrate, service environment and your current cure window. We reply with candidate series, TDS and sample options.