Spray the primer and topcoat on trial panels or real parts using your production cure, then test the combined system for inter-coat adhesion, mechanical properties and salt spray. Single-coat TDS values cannot be added together.

Coating test equipment in WANAN’s laboratory

When to use this guide

Use it for aggressive outdoor steel, structural parts, energy-storage cabinets and machinery where an EZ or E primer sits under a P480, P720 or P1680 topcoat.

What you need

  • Primer (E or EZ) and topcoat (P series) samples in the target colour
  • Production-pretreated panels or parts
  • Your cure profile for both coats
  • The test programme your customer or standard requires

Steps

  1. Fix the system and the target

    Write down primer, topcoat, film thickness for each coat and the result the specification requires.

  2. Prepare panels on your line

    Use production pretreatment. TDS values come from phosphated steel; your line sets the real ceiling for adhesion and corrosion life.

  3. Apply and cure as in production

    Apply the primer, then the topcoat, using the cure schedule you will really run, and record the object-temperature profile.

  4. Test inter-coat adhesion first

    Cross-cut (ISO 2409), impact (ISO 6272-2) and bend (ISO 1519) on the two-coat film reveal cure mismatch early.

  5. Run humidity and salt spray on the system

    Test the combined system to ISO 6270-1 and ISO 9227. WANAN’s CNAS-accredited laboratory can run these during qualification.

  6. Freeze the parameters

    Record film thicknesses, cure profile and batch numbers in the qualification file before release.

Key values

ItemValueSource
Primer optionsE (1440 h) or EZ zinc-rich (≥ 2000 h) single-coat salt spraySeries TDS
Topcoat optionsP480 / P720 / P1680Series TDS
RuleSystem values are tested, never addedPowder coating 101
LaboratoryCNAS L15415, ISO/IEC 17025:2017Certifications
Values apply to the stated test methods and conditions. Final settings are confirmed on your own parts and line.

Common mistakes

  • Quoting the EZ primer’s ≥ 2000 h as the system result
  • Curing the primer differently from the production plan
  • Skipping inter-coat adhesion and going straight to salt spray
  • Changing either powder after qualification without re-testing

Published 7 October 2026 by the WANAN technical team. Figures are taken from WANAN technical data sheets and the pages linked above.

Technical support

Talk to our technical team

Send the substrate, service environment and your current cure window. We reply with candidate series, TDS and sample options.